October7 , 2026

    Tribals elated as Peddapalli-Manuguru rail line in T’gana’s coal corridor gets ‘spl’ project status

    Related

    Zeeshan Mukhi Named Chief Commercial Officer at APM Terminals Pipavav

    APM Terminals Pipavav has appointed Zeeshan Mukhi as its...

    India Eases Rules for Reflagging Container Ships

    India has eased regulations governing the reflagging of container...

    Sanctioned Tankers, LNG Carrier Sent for Recycling in India

    Several sanctioned tankers, along with an LNG carrier, are...

    Rajnath Singh Launches First FSS, Marks Keel-Laying of FSS-5

    Defence Minister Rajnath Singh launched the Indian Navy’s first...

    Share

    For the first time, tribals in erstwhile Khammam can travel to the national capital through direct rail connectivity with the Centre designating the new Ramagundam-Manuguru rail line with ‘special’ project status to expedite it. This project is expected to cost approximately 3,600 crore.

    The decision to approve the project, stretching from Ramagundam (Peddapalli) to Manuguru (Bhadradri Kothagudem), was based on the potential for generating substantial revenue through the transportation of coal from these areas to various parts of India.

    This route, often referred to as coal corridor, holds significant promise for the region’s economic growth.

    The implementation of this project is expected to bring about a two-fold benefit. Firstly, it will significantly boost freight transportation, allowing for the efficient movement of coal from the mining areas to other regions of the country. Secondly, it will provide a convenient train route for passengers travelling from the tribal regions to the nation’s capital, New Delhi, via Ramagundam, Balarshah, and Nagpur. Railway authorities have stated that the proposed rail line will link various historical and cultural sites, including the Ramappa temple. Additionally, it will establish a connection to the Singareni coal mining regions of
    Ramagundam and Bhadrachalam.

    “Already a DPR regarding this project was submitted to the Centre. The land acquisition process for the project is currently underway,” said a senior railway official.

    Additionally, there are plans to establish a railway line linking Kothagudem with Malkangir in Odisha. This will provide access to the eastern state and Chhattisgarh.