October25 , 2026

    Brahmaputra boost: Five new bridges under construction as National Waterway-2 project advances

    Related

    Rail Container Movement Picks Up at Vallarpadam ICTT After Years of Underutilisation

    Container movement by rail to the Vallarpadam International Container...

    Indian Railways Launches Specialised Salt Container Train in Kutch, Targets 11% Logistics Savings

    Indian Railways has introduced the country’s first specialised salt...

    India–US East Coast Spot Freight Rates Fall as Carriers Compete for Cargo

    India–US East Coast spot freight rates have dropped sharply,...

    Southern Railway Approves Container Handling at Trichy Goods Shed

    Southern Railway has approved lift-on, lift-off (Lo-Lo) container handling...

    Share

    In a significant update provided to the Rajya Sabha, the Ministry of Ports, Shipping and Waterways, led by Union Minister Sonowal, detailed the ongoing construction of five bridges over the Brahmaputra River as part of National Waterway-2. This waterway stretches 891 kilometers from Dhubri to Sadia and was officially designated as National Waterway-2 in September 1988.

    Bridge Construction and Regulatory Compliance

    The Ministry highlighted that constructing any bridge over a National Waterway requires a “No Objection Certificate” (NoC) from the Inland Waterways Authority of India (IWAI). This certification is crucial to ensure that the bridges comply with safety standards concerning horizontal and vertical clearances, essential for maintaining navigational safety.

    As per the Inland Waterways Authority of India (Classification of Waterways in India) Regulations, 2006—amended in 2016 and 2022—the Brahmaputra River is classified into two segments:

    • Dhubri to Dibrugarh: Classified as Class-VII waterway, requiring a minimum horizontal clearance of 100 meters between piers and a minimum vertical clearance of 10 meters.
    • Dibrugarh to Sadia: Classified as Class-V waterway, necessitating a minimum horizontal clearance of 80 meters between piers and a minimum vertical clearance of 8 meters.
    Guwahati Bridge Update

    The Ministry also confirmed that the NoC for a new bridge connecting Bharalumukh (South Guwahati) to North Guwahati was issued to the Guwahati Metropolitan Development Authority (GMDA) on February 28, 2018. This clearance ensures the bridge’s compliance with navigational requirements, enhancing the safe and efficient movement of vessels along the waterway.

    The construction of these bridges is expected to significantly improve infrastructure, boost connectivity, and facilitate economic growth in the region by enhancing the functionality of National Waterway-2.