Among these critical units, the heaviest weighed 1160 tons with dimensions of 74 meters in length, 9.5 meters in width, and 10.3 meters in height. The longest unit movement of 90-meter length weighing 600 ton involved jacking the equipment onto the SPMT (Self-Propelled Modular Transporter).

This operation required 56 SPMT axle lines in various configurations, along with 2 power pack units. Additionally, 4 hydraulic jacks with a capacity of 200 tons each, coupled with power packs, were utilised for jacking up the equipment to achieve the necessary axle insertion height. EXG leveraged its own SPMTs and hydraulic jacks, which significantly contributed to cost-effectiveness.

EXG’s exemplary handling of all 31 pieces of this critical equipment during the Mega PX-PTA project at Paradip Refinery underscores the operational team’s expertise and EXG’s commitment to excellence and growth in delivering high-quality solutions to clients.