September2 , 2026

    Historic achievement at Haldia Dock Complex: First-ever 9.20 M draft container vessel berth

    Related

    Mundra Port Container Movement Hit as 1,500 Transporters Join Empty Depot Strike

    Container movement at Mundra Port has been disrupted after...

    JSW Tuticorin Multipurpose Terminal Achieves Record Monthly Cargo Volume at VOC Port

    JSW Tuticorin Multipurpose Terminal Private Limited (JSWTMTPL) has achieved...

    X-Press Feeders Makes First Service Call at TICT, Tuticorin

    V.O. Chidambaranar Port Authority (VOC Port), Tuticorin, has successfully...

    Susanta Purohit Takes Additional Charge as Chairperson of Paradip Port Authority

    Susanta Kumar Purohit has assumed additional charge as Chairperson...

    Share

    Haldia Dock Complex (HDC) recorded a historic milestone today with the successful berthing of MV SITC ZHI at its container terminal during the morning tide. The vessel arrived with a draft of 9.20 metres and a Length Overall (LOA) of 171.90 metres, marking the first instance of such a deep-draft container vessel calling at HDC since its inception.

    This achievement highlights HDC’s enhanced marine capabilities and operational efficiency, enabling the port to handle larger container vessels with greater ease. It sets a new benchmark for the complex and significantly strengthens its position as a key gateway for international trade in the region.

    The successful handling of MV SITC ZHI is a testament to the dedicated efforts of the Marine Department and operational teams, whose professionalism and expertise made this landmark accomplishment possible.

    HDC remains committed to continually upgrading its infrastructure and services in alignment with the growing demands of global maritime trade, reaffirming its role as a critical node in India’s logistics and supply chain ecosystem.