October11 , 2026

    Noida International Airport completes vital DME and DVOR air calibration, sets stage for aviation growth

    Related

    Trichy to Develop Multimodal Logistics Hub with Dry Port

    Tiruchirappalli (Trichy) is set to strengthen its logistics infrastructure...

    Andhra Pradesh Pushes for Shipbuilding Centre at Dugarajapatnam

    Andhra Pradesh Chief Minister N. Chandrababu Naidu has sought...

    Goa Shipyard Marks Commissioning of ICGS Ajit

    Goa Shipyard Limited (GSL) has marked another milestone in...

    India’s Logistics Sector Targets $600 Billion by FY32, Says DPIIT Official

    India’s logistics sector is projected to reach $600 billion...

    Indian Rice Export Prices Stay Elevated as Rupee Slides

    Indian rice export prices have remained near a one-year...

    Share

    The Noida International Airport on Thursday announced the completion of air calibration for the DVOR and DME systems. These systems are crucial components aiding navigation, landing, and aircraft departure. Last week, calibration commenced with the inaugural flight of the Beechcraft King Air B300, a twin-engine turboprop aircraft, at the greenfield airport in Jewar, approximately 75 km from Delhi.

    The Noida International Airport posted on its official account on X and said, ’’Milestone alert! Air calibration of the DME and DVOR-two essential systems supportive of landing, departure, and navigation of the airplane is completed’’.
    How do DME and DVOR function?

    The DME (Distance Measuring Equipment) and DVOR (Doppler VHF Omnidirectional range) play a very important role in regulatory compliance, operational planning, and adhering safety of aviation. Calibration flights by taking cues from these navigation tools, make sure to maintain safe and smooth air traffic flow and aid in rapid growth and progress of air transportation at par with global standards.

    Development plan of Noida International Airport:

    The Noida International Airport on completion is expected to become India’s largest airport by 2040 and will be constructed in four phases. The airport has been erected on a massive 5,000-hectare area and will consist of three runways. The commercial operations are likely to commence by the end of 2024.