July7 , 2026

    Vizag Port Flyover: Rs 300 crore project to ease congestion

    Related

    DP World Expands Coastal Fleet with Acquisition of India-Flagged Container Vessel DP World Indus

    DP World's Marine Services business, Shipping Solutions, has strengthened...

    Adani Logistics Handles First Import Shipment at ICD Virochannagar

    Adani Logistics has achieved a significant milestone in strengthening...

    Heavy Rains Disrupt JNPA Port Operations; Vessel Movement and Container Logistics Hit

    Continuous heavy rainfall accompanied by strong winds of 70–80...

    Fatal Dockside Accident Halts Operations at JNPA Container Terminal

    Operations at one of the container terminals at Jawaharlal...

    Share

    An agreement worth Rs 300 crore was signed between Visakhapatnam Port Authority (VPA) and Rail Vikas Nigam Ltd (RVNL) on Thursday, January 2, to construct a flyover to reduce congestion and enable seamless cargo movement via road and rail traffic towards the port. The project will cover the areas surrounding the port and critical parts of the city leading to it and is designed to improve traffic management and cargo evacuation.

    Rs 300 Crore Flyover Project Details for Visakhapatnam Port

    According to an official press release from VPA, “The agreement pertains to constructing a flyover bridge connecting Seahorse Junction to the dock area at Vizag Port. The estimated cost of the project is approximately Rs 300 crore. The flyover will eliminate 11 level crossings obstructing traffic flow, ensuring smooth cargo movement.”

    The flyover, which spans 3.3 km in length, will feature a carriageway width of seven metres for two lanes and 10.5 metres for three lanes, facilitating efficient entry and exit for port-bound traffic.

    spot_img