May17 , 2026

    Dredging completes at North Cargo Berth-3 at VOC Port

    Related

    MSC MICOL Calls at Vizhinjam Port, Reinforcing Mega Vessel Handling Capability

    India’s newest deep-water transshipment hub, Vizhinjam International Seaport, welcomed...

    DG Shipping Bars 366 Foreign Ships from Hiring Indian Seafarers Over Abandonment Violations

    India’s maritime regulator, the Directorate General of Shipping (DG...

    PSA Mumbai Terminal, CONCOR Forge Rail Cargo Partnership

    PSA Mumbai Terminal and Container Corporation of India (CONCOR)...

    CONCOR Achieves 5.58 Million TEUs Cargo Volume in FY26

    Container Corporation of India (CONCOR) reported a container throughput...

    Share

    Dredging operations have been successfully concluded at North Cargo Berth-III at V.O. Chidambaranar Port Authority (formerly known as Tuticorin Port).

    With this achievement, a 14.20-meter draft will be available, enabling the commencement of cargo handling activities using state-of-the-art harbour mobile cranes from May 2025.

    As a result of this accomplishment, the Port has reclaimed 11 hectares of land, which
    will be effectively utilized for cargo storage, turning waste into valuable resources.

    spot_img