State-run Shipping Corporation of India (SCI) has invited bids for the construction of 22 vessels worth up to $3.2 billion, in a major push to strengthen India’s domestic shipbuilding industry and attract global shipbuilding companies to establish manufacturing facilities in the country.
The proposed fleet acquisition programme includes eight very large gas carriers (VLGCs), six 18,000 TEU container ships, six 8,000 TEU container ships and two Suezmax tankers of 155,000 deadweight tonnes (DWT) each. The initiative supports the government’s ambition to make India one of the world’s top five shipbuilding nations by 2047.
The eight VLGCs, each with a capacity of 88,000 cubic metres, will transport liquefied petroleum gas (LPG), including propane and butane, as well as ammonia. These vessels are proposed to be acquired through a joint venture involving SCI and state-owned oil companies. Of the six 18,000 TEU container ships, two will be built for SCI and four for the proposed Bharat Container Shipping Line. The six 8,000 TEU vessels and two Suezmax tankers are intended for SCI.
A key feature of the tenders is the mandatory involvement of international shipbuilders in developing domestic construction capabilities. For the VLGC order, two vessels will be built at an established international shipyard and the remaining six in India. Foreign shipbuilders must demonstrate experience in delivering at least three VLGCs, very large ethane carriers (VLECs) or LNG carriers (LNGCs) during the past five years.
International shipyards can participate either by establishing a majority-owned shipbuilding facility in India or through technical collaboration with an existing Indian shipyard. The collaboration must include basic and detailed design support throughout the project until vessel delivery. Similar requirements apply to the six 18,000 TEU container ships, of which two will be built overseas and four in India.
SCI has also stipulated infrastructure development requirements, including ship-lift capacity, cranes and other facilities necessary for constructing sophisticated vessels. Indian shipyards will be evaluated through a qualification template prescribed by SCI, while foreign shipbuilders setting up facilities in India must provide firm infrastructure development timelines.
For the six 8,000 TEU container ships, comprising two firm and four optional orders, and the two Suezmax tankers, qualified Indian shipyards will receive the Right of First Refusal (RoFR). The lowest evaluated qualified Indian bidder will be allowed to match the lowest evaluated bid submitted by a foreign shipyard.
The initiative comes amid the government’s ₹69,725 crore shipbuilding support package, which includes the Shipbuilding Financial Assistance Scheme, Shipbuilding Development Scheme and Maritime Development Fund. Five mega greenfield shipbuilding clusters in Gujarat, Maharashtra, Tamil Nadu, Andhra Pradesh and Odisha have also received in-principle approval.
Among international shipbuilding majors being encouraged to invest in India, South Korea’s HD Hyundai Heavy Industries has shown serious interest in establishing an anchor facility at the proposed greenfield shipbuilding cluster in Thoothukudi, Tamil Nadu.
In October 2026, Union Minister for Ports, Shipping and Waterways Sarbananda Sonowal led a delegation to South Korea and invited leading shipbuilders, including HD Hyundai Heavy Industries, Samsung Heavy Industries and Hanwha Ocean, to explore investment opportunities in India.
The SCI tender programme is expected to provide a significant opportunity for Indian shipyards to acquire advanced shipbuilding technologies, strengthen infrastructure and develop capabilities to construct large and complex vessels, positioning India as a competitive player in the global shipbuilding industry.
