June7 , 2026

    Final location survey for Jajpur Road-Dhamra Port via Aradi rly line sanctioned

    Related

    VOC Port Launches New Tuticorin-Colombo Shuttle Feeder Service

    In a move aimed at strengthening regional maritime connectivity...

    Red Sea Shipping Network Adds Mundra–Jeddah Connection

    India’s Mundra Port has been linked to Saudi Arabia’s...

    GBTPL Accelerates Mechanization of Haldia Berth 5, Targets Commissioning by FY28

    Ganges Bulk Terminal Pvt. Ltd. (GBTPL), a joint venture...

    Share

    The ministry of railways on Monday sanctioned final location survey (FLS) for construction of new line between Jajpur Keonjhar Road and Dhamra Port via Jajpur and Aradi (96km).

    The survey will be conducted at a cost of Rs 2.4 crore.

    It was a long-standing demand of people of Jajpur and Bhadrak districts.

    They have been demanding this line for the last several years.

    Recently, they staged demonstration and dharna in front of East Coast Railway (ECoR) headquarters here.

    They have created a movement supporting the new railway line.

    Besides, they have met several leaders to look into the matter and impose pressure on the government to take up the new line issue.

    spot_img