November12 , 2026

    Final location survey for Jajpur Road-Dhamra Port via Aradi rly line sanctioned

    Related

    Paradip Port Records 58.84% Growth in Calibrated Lumps Ore Handling

    Paradip Port Authority has registered an impressive 58.84% year-on-year...

    SMP Kolkata Pushes Integrated Riverfront Development and Urban Infrastructure Initiatives

    Syama Prasad Mookerjee Port, Kolkata (SMPK), is expanding its...

    Asian Shipping Lines Expand Container Capacity on Indian Trade Routes Amid Strong Demand

    Asian shipping lines are expanding their container shipping capacity...

    Share

    The ministry of railways on Monday sanctioned final location survey (FLS) for construction of new line between Jajpur Keonjhar Road and Dhamra Port via Jajpur and Aradi (96km).

    The survey will be conducted at a cost of Rs 2.4 crore.

    It was a long-standing demand of people of Jajpur and Bhadrak districts.

    They have been demanding this line for the last several years.

    Recently, they staged demonstration and dharna in front of East Coast Railway (ECoR) headquarters here.

    They have created a movement supporting the new railway line.

    Besides, they have met several leaders to look into the matter and impose pressure on the government to take up the new line issue.