October31 , 2026

    L&T bags Rs 7,000 crore contract for underground road project

    Related

    Centre Sanctions ₹430.7 Crore for Dredging at Kolkata and Haldia Ports

    The Centre has sanctioned ₹430.7 crore to Syama Prasad...

    TCI Takes Delivery of 500-TEU Container Vessel ‘TCI SETU’

    Transport Corporation of India Limited (TCI) has taken delivery...

    Jade Pacific Line Enters Asian Short-Haul Shipping Market with New India–Red Sea Service

    Singapore-based Jade Pacific Line (JPL) has entered the regional...

    OOCL to Launch New China–Indonesia Container Service in November

    OOCL will launch its new China Indonesia Service (CIS4)...

    Share

    Engineering and construction conglomerate Larsen & Toubro (L&T) on Friday said it has bagged a mega order worth over Rs 7,000 crore to design and construct an underground road tunnel.

    The project was won by heavy civil infrastructure business vertical of L&T Construction from Mumbai Metropolitan Region Development Authority (MMRDA).

    The contract is for design and construction of an underground road tunnel between Orange Gate, Eastern Free Way to Marine Drive coastal road in Mumbai.

    In a statement, the company said that the scope of work for project comprises design and construction of twin road tunnels using tunnel boring machines (TBMs), connecting these tunnels to the existing elevated Eastern Freeway at Orange Gate near its southern terminal through transition ramps and to Marine Drive in Mumbai.

    The project is expected to be completed in 54 months. L&T is a USD 23-billion multi- national firm which is engaged in engineering, procurement and construction projects, hi-tech manufacturing and services.

    It operates in over 50 countries worldwide.