July31 , 2026

    Trial run of empty wagon at Hubballi rail track successful

    Related

    IndianOil LNG Floats Tender for Long-Term VLGC JV Amid Soaring LPG Freight Rates

    Facing an exceptionally tight liquefied petroleum gas (LPG) shipping...

    JNPT, Nashik Administration Advance Plans for Niphad Multi-Modal Logistics Park

    The proposed Multi-Modal Logistics Park (MMLP) at Niphad moved...

    Exporters Flag West Asia Crisis Impact on Orders, Shipping Costs and Supply Chains

    Indian exporters have expressed growing concern over the prolonged...

    Share

    The first trial run of empty coal wagons was carried out on the railway track that was affected due to the derailment of a goods wagon. The track between Sonalim and Dudhsagar railway stations in the Braganza Ghat section of Hubballi was restored on Monday evening, four days after the incident.

    “SWR has restored the services from the affected portion of the railway tracks, and the first trial run was held successfully at 6pm on Monday.

    The passenger train services will resume from Tuesday, only after considering all the safety aspects and getting the approval of the technical and engineering departments of the South Western Railway (SWR),” said sources in SWR.

    spot_img