October30 , 2026

    Major Infrastructure Boost at Paradip Port

    Related

    Centre Sanctions ₹430.7 Crore for Dredging at Kolkata and Haldia Ports

    The Centre has sanctioned ₹430.7 crore to Syama Prasad...

    TCI Takes Delivery of 500-TEU Container Vessel ‘TCI SETU’

    Transport Corporation of India Limited (TCI) has taken delivery...

    Jade Pacific Line Enters Asian Short-Haul Shipping Market with New India–Red Sea Service

    Singapore-based Jade Pacific Line (JPL) has entered the regional...

    OOCL to Launch New China–Indonesia Container Service in November

    OOCL will launch its new China Indonesia Service (CIS4)...

    Share

    A significant milestone has been achieved at Jindal Paradip Port Limited as the equipment vessel “MV RUN ZHOU” successfully berthed at the South Jetty of the Western Dock carrying two high-capacity 3000 TPH Multi-Purpose Gantry Cranes.

    The arrival of these advanced cranes marks a major step forward in strengthening cargo handling capabilities and improving operational efficiency at the port. The new equipment is expected to play a crucial role in accelerating cargo operations and supporting higher throughput at the Western Dock.

    The development also reflects the rapid progress of the Western Dock infrastructure project, with modernization works continuing ahead of schedule, reinforcing Paradip’s position as a key maritime and logistics hub on India’s eastern coast.