August28 , 2026

    Hanwha Shipping Welcomes First 320,000-DWT VLCC

    Related

    JNPA Climbs to 21st Globally in Alphaliner’s Top 30 Container Ports Ranking

    Jawaharlal Nehru Port Authority (JNPA) has strengthened its position...

    V.O. Chidambaranar Port Records 17.42% Growth in Vinyl Chlorides Cargo Handling

    V.O. Chidambaranar Port Authority (VOCPA) has recorded a significant...

    ₹2,057 Crore PSA SICAL Royalty Dispute Referred to Settlement Panel

    A long-running dispute between VOC Port Authority and PSA...

    Montreal Port Names Senior Advisor to Boost India Trade

    The Montreal Port Authority has appointed Prakash R. Tulsiani...

    Share

    Hanwha Shipping has named the Elandra K2, a 320,000-dwt very large crude carrier (VLCC) and the first vessel in its new fleet. The naming ceremony was held at Hanwha Ocean’s Okpo Shipyard in South Korea, with the vessel built to American Bureau of Shipping (ABS) class.

    The Elandra K2 is the first of three 320,000-dwt VLCCs being built for Hanwha Shipping. The second vessel, Elandra Kunlun, is scheduled for delivery in December 2026, while Elandra Kilimanjaro is expected to follow in February 2027.

    The new tanker features ABS Fuel Ready Level 1C notations covering ammonia, LNG and methanol, providing flexibility for future alternative-fuel adoption as environmental regulations evolve.

    The vessel also incorporates an enhanced cyber-resilience framework based on the IACS UR E26 standard. ABS said the ships were designed with multi-fuel readiness and cyber resilience integrated from the construction stage.

    The arrival of the Elandra K2 marks a major milestone for Hanwha Shipping as it establishes its own fleet and expands into ship ownership. The company plans to build on the three-VLCC programme as part of its wider shipping business.