August5 , 2026

    Port of Rønne expands offshore wind capabilities

    Related

    PIL Strengthens India–East Africa Trade with Launch of Weekly Imara Express Service

    Pacific International Lines (PIL) has announced the launch of...

    Indian-Flagged Vessel Sinks After Attack Off Yemen; All 13 Indian Crew Rescued

    An Indian-flagged merchant vessel, MSV Faize Noore Oliya, came...

    V.O. Chidambaranar Port Records 106.55% Growth in Windmill Blade Cargo Handling

    Reinforcing its position as a key facilitator of India's...

    CONCOR Launches Import Loaded Reefer Movement Facility at ICD-TKD

    Container Corporation of India (CONCOR) has operationalised Import Loaded...

    Share

    The Port of Rønne has expanded its offshore capabilities with new quay infrastructure and advanced ShibataFenderTeam fender systems, strengthening its role as a key Baltic hub for wind energy logistics.

    Located on the Danish island of Bornholm, the Port of Rønne plays a central role in supporting offshore wind projects across the Baltic Sea.

    Phase 3 of the port’s future-proofing project, closely aligned with a broader climate and infrastructure strategy, began in late 2023. This phase added over 100,000 square metres (m²) of project space, a 280-metre quay, and a new RoRo ramp, among other upgrades.

    The new facilities further strengthen the port’s growing importance as a logistics hub for  wind turbine shipments and offshore activity in the region.

    SFT was once again selected to collaborate with the contractor MT Højgaard, continuing a partnership built over previous development phases at the Port of Rønne.

    The delivery prominently featured 24 Element Fenders (FE 1250×1000 mm, G2.4) with closed-box steel panels measuring 2250 × 2850 millimetres (mm). The project scope also included 10 steel ladders and 28 T-head bollards, 24 of them with 125t mooring capacity  and four with a capacity of 200t.

    Faced with high demands on design, performance, testing, and rubber quality, our in-house engineering team designed the Element Fender systems to fully meet all requirements.

    The final solution included tension chains to control deflection, ensuring efficient energy absorption, durability, and structural integrity during berthing impacts.

    Last month, ShibataFenderTeam opened its fourth manufacturing facility in Valencia, Spain, to double production capacity for foam fenders and steel works.

    spot_img