October26 , 2026

    Fast Logistics executes heavy-lift project shipment to Jebel Ali

    Related

    M/V Beypore Sultan Completes 100th Voyage on Ranong–Yangon Route

    M/V Beypore Sultan completed her 100th voyage on the...

    VOC Port Crosses 25 Million Tonnes in Cargo Throughput in FY 2026–27

    Tuticorin: V.O. Chidambaranar Port Authority (VOCPA), Tuticorin, has crossed...

    Paradip Port Records Strong Growth in PCI Coal and Pig Iron Handling in FY 2026–27

    Paradip Port Authority has registered significant growth in the...

    Share

    Fast Logistics has successfully executed a challenging project shipment involving several heavy machine equipment units, each weighing 15 tons. The consignment, comprising a Pyramid Assembly, was moved seamlessly from Kundli pickup point to ICD Tughlakabad for stuffing, onwards to Mundra Port, and finally to Jebel Ali.

    Every stage of the operation was closely monitored, with the Fast Logistics team personally present at site to ensure flawless loading, safe handling, and secure transportation.

    This move highlights Fast Logistics’ expertise in handling complex project cargo, demonstrating its ability to deliver bigger solutions with smarter thinking for global logistics requirements.