August20 , 2026

    Kamarajar Port Handles Longest ODC Cargo at GCB

    Related

    India Set to Explore Northern Sea Route for Russia Trade

    India is planning to send its first cargo vessel...

    Chennai Port Plans ₹17,700 Crore Outer Harbour Development

    Chennai Port is moving ahead with plans to develop...

    beOnd Taps Aeroprime to Build India Cargo Network

    Premium leisure airline beOnd has signed a Memorandum of...

    Share

    Kamarajar Port Limited (KPL) achieved a milestone on 8 October 2025 by handling a single unit of breakbulk cargo measuring 90 feet in length and weighing 280.02 tonnes — the longest Over-Dimensional Cargo (ODC) ever handled at its General Cargo Berth (GCB).

    The project cargo, a Heat Boiler shipped from Constanta, Romania, was imported by L&T Energy Hydrocarbon, Kattupalli.

    The Marine Department ensured safe unloading by following safety SOPs and deploying stabiliser pontoons, while the Traffic Division enabled smooth evacuation using an 18-axle long trailer after clearing internal port roads.

    KPL Managing Director, Smt. J.P. Irene Cynthia, IAS, commended NTC Logistics (CHA), Sai Shipping (Shipping Agent), and Success Shipping (Stevedore) for their seamless coordination in executing the operation.

    With this accomplishment, KPL reaffirms its capability in handling complex project cargo with safety, precision and teamwork.