October27 , 2026

    New railway lines connecting Northeast via Bangladesh and Nepal

    Related

    V.O. Chidambaranar Port Crosses 25 Million Tonnes in Cargo Handling, Sets New Operational Records

    V.O. Chidambaranar Port Authority (VOCPA) has crossed the 25-million-tonne...

    Naukosh Digital Portal to Strengthen India’s Shipbuilding and Ship Repair Industry

    India is developing Naukosh, a comprehensive digital portal dedicated...

    Chennai Port Handles Record 9,929 TEUs in a Single Day, Highest Since COVID-19

    Chennai Port Authority handled 9,929 twenty-foot equivalent units (TEUs)...

    Chennai Port Authority Explores Maritime Cooperation with Taiwan

    Chennai Port Authority held discussions with Mr. Stephen Hsu,...

    India Introduces New Coastal Shipping Requirements for Foreign Vessels

    India has introduced an expanded regulatory framework governing foreign...

    Share

    The Railway Board has sanctioned Final Location Survey for extending new railway lines that will connect the northeastern states via Bangladesh and Nepal, skipping the Siliguri corridor. Fourteen new rail connecting routes and alternate routes have been sanctioned. On the Bangladesh route, around 500km of new railway lines have been ordered and gauge conversion will be performed for 367km. On the Nepal route, over 200 km of new lines will be laid; while in the North East there will be another 212 km of lines being laid.

    About 250 km of new lines will be laid along West Bengal – Bangladesh – Meghalaya route (Balurghat – Hili – Gaibandha – Mahendraganj – Tura – Mendipathar segment). In two sections of the West Bengal – Bangladesh route, 80 km and 60 km of new railway lines will come up, respectively.

    In another segment connecting West Bengal to Assam via Bamanhat in Bangladesh, 38 km of new railway line will be laid; while for Balurghat – Hili – Parbatipur – Kaunia – Lalmanirhat – Mogalhat – Gitaldaha section (an existing India – Bangladesh trade route) 18 kms of new lines will be laid.

    Gauge conversion: Two West Bengal – Bangladesh – Tripura routes (Gede – Darsana – Akhaura – Agartala and Petrapole – Benapole – Nabharon – Jessore – Rupdia – Padmabila – Lohagara – Kashiani – Shibchar – Mawa – Nimtala – Gendaria – Dhaka – Tongi – Bhairab Bazar – Akhaura – Agartala ) will require 100 km and 120 km of gauge conversions respectively. Nepal side: 190km of new lines between Biratnagar – New Mal; and another 12.5 km of new lines in Galgalia – Bhadrapur – Kajali Bazar section.