June4 , 2026

    Port of Vancouver expands centralised maritime traffic system

    Related

    Hirnoda Dry Port to Cut Logistics Costs and Boost Exports

    The upcoming dry port at Hirnoda is expected to...

    MV PROPEL FORTUNE Berths at Deendayal Port with Coal Cargo for UltraTech Cement

    The vessel MV PROPEL FORTUNE has successfully berthed at...

    Mawani Launches New Shipping Service Connecting Jeddah, India and Djibouti

    Saudi Ports Authority (Mawani) has announced the launch of...

    India and Brunei Discuss Expanding Maritime Cooperation

    Shri Venkatesapathy S., Joint Secretary, Ministry of Ports, Shipping...

    Share

    The Vancouver Fraser Port Authority has announced an expansion to its centralised maritime traffic scheduling system to span the whole Burrard Inlet.

    The system allows the port authority to take an active role in sequencing commercial ship movements in Burrard Inlet – which is home to 23 of the Port of Vancouver’s 29 major terminals, receives nearly two-thirds of the port’s deep-sea ship traffic, and supports more than $105 billion in annual goods movement.

    The centralised scheduling system, which was created in collaboration with DHI SeaPort OPX, incorporates advanced digital modelling such as weather predictions and tides to assist in the planning and optimisation of commercial ship movements in high-traffic regions of Vancouver Harbour.

    It is projected to assist in the coordination of over 5,000 cargo vessels, cruise ships, and tug-pulling barge movements each year, with up to 20 daily transits beneath the Lions Gate Bridge during peak demand.

    The system will also improve awareness of maritime movements in Burrard Inlet, allowing port users to coordinate more effectively and ship, terminal, and rail bridge operators to anticipate demand and optimise operations.

    This involves giving vision over ship transits via the Second Narrows rail crossing, allowing CN to increase rail service capacity and dependability throughout the North Shore commerce route.

    In 2023, North Shore terminals handled around 30 per cent of the port’s total cargo traffic, including 50 per cent of grain exports.

    The port authority’s Active Vessel Traffic Management Program includes a centralised scheduling system that was implemented in eastern Burrard Inlet in October 2023.

    It facilitates the routing of cargo ships, tugs, and barges to six marine terminals east of the Second Narrows rail bridge, including bulk exporters Pacific Coast Terminals (PCT) and Trans Mountain.

    In 2023, more than $105 billion in commodities travelled through Burrard Inlet, including bulk exports like grain and fertilizer, containerized trade, and breakbulk cargo including forestry goods and construction steel, as well as 332 cruise liner trips to the Canada Place terminal.

    Almost 2,000 of the port’s 3,000 annual deep-sea ship journeys travel via Burrard Inlet. The port authority intends to expand the centralised scheduling system to the Fraser River by the end of 2025, covering the whole Port of Vancouver.

    In October, the Vancouver Fraser Port Authority named Captain Shri Madiwal as Vice President (VP) of Operations and Supply Chain.

    spot_img