October16 , 2026

    Waltair logs 50mt freight in record 230 days

    Related

    Visakhapatnam Port Handles 50 Million Tonnes of Cargo in Record 196 Days

    Visakhapatnam Port Authority (VPA) has handled 50.007 million tonnes...

    MV TIGER WEST Berths at Deendayal Port with 71,551 MT of Steam Coal

    MV TIGER WEST has berthed at Deendayal Port Authority...

    Port of Montreal, Adani Group Extend Collaboration to Boost Bilateral Trade

    The Montreal Port Authority and India’s Adani Group have...

    Kochi Port Explores AI-Powered Immigration for Cruise Passengers

    The Indian Ports Association is preparing to float a...

    India–Europe Shipping Corridor Poised for 3 Million Containers a Year

    The proposed India–Middle East–Europe Economic Corridor (IMEC) could eventually...

    Share

    The Waltair division of the East Coast Railway has achieved a milestone by handling an unprecedented 50 million tonnes of freight loading in 230 days as of November 16.

    This was a 12.5 per cent increase compared to the previous year and shatters the division’s earlier record of 50mt in 256 days during the 2023-24 period, a full 26 days faster than before.

    The performance has elevated Waltair to the 5th top-performing division across the Railways, improving from its 6th position last year. Adding to the division’s impressive list of accomplishments, it registered an all-time high of 7.10mt of freight loading in October 2025, surpassing all previous monthly records.

    The division’s success was driven by consistent efforts to enhance traffic facilities, ensure optimal rake availability and provide timely rake allocations to customers, a railway release said on Sunday.

    Key loading points contributing to this growth include the Vizag port, Gangavaram port, steel plant, HPCL, Utkal Alumina and NMDC. Divisional railway manager Lalit Bohra congratulated the traffic department for this achievement and commended all associated departments for their dedicated teamwork and relentless efforts.