August21 , 2026

    ClassNK okays ‘world’s first’ onboard CCS installation on Neopanamax

    Related

    MV Densa Eagle Berths at Deendayal Port with 47,250 MT of Granular Urea

    MV Densa Eagle has berthed at Deendayal Port, Kandla,...

    VOC Port Conducts 2nd Annual ISPS Code Statement of Compliance Audit

    V.O. Chidambaranar Port Authority underwent the 2nd Annual Statement...

    APSEZ Poised to Secure Dry Bulk Berths at Paradip Port

    Adani Ports and Special Economic Zone Ltd (APSEZ) is...

    India Boosts Air Cargo Efficiency with 20-Hour Transit Target

    India has significantly accelerated domestic-to-international air cargo transshipment by...

    Delhi Airport Expands Air Cargo Network to London and Copenhagen

    Delhi’s Indira Gandhi International Airport has expanded India’s domestic-to-international...

    Share

    Japanese classification society ClassNK has certified “the world’s first” onboard carbon capture and storage (CCS) system installation on a Neopanamax ship.

    The SCCS-Full class notation was granted to Ever Top, a 13,806 TEU container vessel owned by Taiwan’s shipping company Evergreen Marine Corp.

    The CCS systems, designed and developed by Shanghai Marine Diesel Engine Research Institute, were installed at Huarun Dadong Dockyard (HRDD).

    ClassNK reviewed the system components and the installation plan, aligning with its “Guidelines for Shipboard CO2 Capture and Storage Systems.”

    The risk assessment through Hazard Identification (HAZID) and the onsite installation process were also examined.

    Following confirmation of compliance with the relevant requirements, the SCCS-Full notation was duly affixed to the vessel.

    As the crucial action of first movers, ClassNK deeply respects the ambitious and practical application of CCS systems taken by EVERGREEN and involved parties to advance GHG abatement technology implementation. It is our great honor to be a part of this outstanding collaboration, and we are committed to supporting proactive initiatives toward decarbonization by providing appropriate standards, surveys, and certifications,” Masaki Matsunaga, Corporate Officer / Director of Plan Approval and Technical Solution Division, ClassNK said.

    In related news, in September last year, ClassNK issued an Approval in Principle (AiP) for an onboard CO2 capture and storage system developed by China Shipbuilding Power Engineering Institute Co. (CSPI), a member of CSSC Power (Group) Co. (CPGC).