May8 , 2026

    VINCI wins cruise ship shore power deal at HAROPA PORT

    Related

    India Extends Ship Flagging Promotion Scheme by Five Years

    The Indian government has extended the scheme for promotion...

    Dry Bulk Shipping Rates Reach Two-Year High on Capesize Demand

    Global dry-bulk shipping rates have climbed to their highest...

    Sarbananda Sonowal Reviews NMHC Progress, Sets July 2026 Target

    Sarbananda Sonowal has reviewed the progress of the National...

    Scan Global Keeps Supply Chains Stable Amid Port Policy Changes

    Scan Global Logistics has reported continued on-time cargo deliveries...

    JNPA Faces Container Delays Due to Trailer and Driver Shortfall

    Jawaharlal Nehru Port Authority has attributed delays in container...

    Share

    A consortium comprised of subsidiaries from VINCI Energies and VINCI Construction has won a contract for the implementation of a high-voltage power supply system at HAROPA PORT’s Pointe de Floride terminal.

    The system is expected to cut emissions by 15,000 tonnes of CO2 equivalent a year, according to French concessions and construction company VINCI.

    The project involves supplying a turnkey electricity conversion substation connected to the public grid to power the cruise ships’ batteries. It also includes the modification of a technical hangar and associated civil engineering works.

    A purpose-designed mobile connection rig will be built to handle the port’s tidal range – which is among the widest worldwide – and to cover the full length of the berths in order to power ships no matter their size.

    Each berth will have a system supplying 11 kV and 6.6 kV power ratings. The first section, the Pierre Callet berth, will be handed over in spring 2025.

    Shore power has emerged as a pivotal solution to reduce reliance on onboard diesel generators, aligning with anticipated European standards by 2030 on the reduction of greenhouse gas emissions from vessels.

    HAROPA PORT’s multimodal terminal in Le Havre is one of Europe’s largest port complexes and is rolling out a vigorous plan to reduce its greenhouse gas emissions and achieve carbon neutrality by 2040.

    This wharf power supply system will be one of the largest ever built in Europe.

    spot_img